Orange Coast College’s new Kinesiology and Aquatics Pavilion consisted of two phases. The first included new construction of a multi-building, one-story complex, measuring 58,000 GSF. The second phase was a renovation of the existing men’s locker room, including work at the existing women’s locker room and existing pool areas, measuring 30,000 GSF. The new complex consists of division offices, athletic training, adaptive P.E., equipment management, locker rooms/showers, support spaces for the aquatics programs (pumps, heaters, etc.), a 65-meter competition pool with double bulkheads, and a 25-meter conditioned instructional pool. The complex is comprised of three buildings, all of which are interconnected by an overhead shade structure. A canopy structure shades the 450-person capacity metal bleachers. The renovation of the existing men’s locker room consolidated existing support spaces for the court sports.
- Expertise
- Coast CCD – Orange Coast College, Kinesiology and Aquatics Pavilion